(VOVworld)- The Vietnam National Oil and Gas Group says Ca Mau fertilizer plan with a capacity of producing 800,000 tones of urea of fertilizer will be handed over by the end of this month as scheduled. Once in operation, the plant will contribute to serving agricultural production in the Mekong River Delta. Built at a cost of 780 million USD, the plant is a part of the Ca Mau Gas-Electricity-Fertilizer complex. It is a key national project and is expected to ensure stable supplies of fertilizer for the country by 2025.